Overview

Project

Blasting and surface preparation of a U.S. military oil storage tank to meet strict military standards.

Location

South Carolina, United States.

Task

Complete the surface preparation and blasting of a large oil storage tank within a significantly reduced timeframe, ensuring the quality meets military specifications.

Challenge

The contractor was tasked with completing the project in just two weeks, compared to the typical three-week timeline, while adhering to the same stringent performance and safety standards.

A contractor based in South Carolina was tasked with a high-priority project: blasting one of the U.S. military's oil storage tanks. Traditionally, a project of this magnitude would take three weeks and require 10 truckloads of abrasive material. However, for this job, the contractor was given only two weeks to complete the task.

Challenge

The primary challenge was the significantly reduced timeline. The contractor needed a solution that would allow them to maintain the required quality and meet the stringent blasting standards set by the military, all within a compressed schedule. The key objective was to find a way to complete the project in two weeks without sacrificing performance or safety.

Discover exceptionally fast blasting performance

Solution

The contractor turned to GMA Garnet™ for a reliable solution. Within days, 10 truckloads of GMA SpeedBlast™ garnet were delivered to the site, along with new high-efficiency blasting equipment. To ensure the project proceeded without delays, GMA also provided an on-site application engineer, who specialized in GMA SpeedBlast™.

The engineer worked closely with the contractor’s team, optimizing the blasting process and addressing any potential productivity challenges.

Total project cost savings

The contractor successfully completed the project 25% under budget, utilizing only half the expected amount of abrasive. As a result, five truckloads of GMA SpeedBlast™ were returned. Additionally, the project was completed in just 13 days, finishing one day ahead of the two-week deadline.

25%

Savings

Using GMA SpeedBlastTM

Key Project Outcomes

  • Optimized Abrasive Usage: With half the anticipated abrasive needed, five truckloads of GMA SpeedBlast™ were returned, highlighting efficient material use.
  • Accelerated Project Completion: The task was completed in just 13 days, one day ahead of the tight two-week deadline, showcasing swift execution.
  • Enhanced Performance: Supported by an on-site GMA application engineer, the team optimized blasting processes and maintained high standards.
  • Efficient Resource Management: The project’s resource use was maximized, leading to reduced waste and improved overall efficiency.

Summary

By utilizing GMA SpeedBlast™ and expert support, the contractor was able to complete the project 40% faster than the standard timeline, under budget, and with significantly reduced abrasive consumption. This case demonstrates the efficiency and effectiveness of GMA Garnet™ solutions in meeting the rigorous demands of high-profile clients, such as the U.S. military.