Topics

Abrasive Blasting Case Studies GMA NewSteel Global

GMA NewSteel™ Unlocks 71% more productivity

Overview

Project

Manage blasting operations for a large-scale storage tank facility.

Location

White Castle, Louisiana, USA

Task

Test GMA NewSteel™ against waste slag.

Challenge

Low productivity and high consumption

Challenge

Apache Industrial Services has been a leading industrial blasting and coatings contractor for more than three decades. With a long list of world-class clients and rigorous quality standards, the company has earned its strong reputation in the petrochemical, industrial and energy sectors.

Throughout 30 years in business, Apache has seen the industrial landscape continually evolve. With project timelines tightening, waste slag's performance issues had become major roadblocks to productivity and profitability.

Recent OSHA regulations and supply shortages only heightened the company's concerns about their current abrasive. Apache also knew its techniques and equipment were keeping its blasters from optimizing their productivity and costs. But like any high quality contractor, Apache wanted to know exactly what would be gained before switching its blasters from one abrasive to another.

As Apache was mulling a switch, its team was contracted to oversee blasting operations at a large-scale storage tank facility—a high-profile project with a razor-thin timeline.

Seizing the opportunity to test alternatives to waste slag, Apache contacted GMA. We were ready to illustrate exactly how GMA NewSteel™ and Black Beauty Fine stacked up.

Total project cost savings

By switching from waste slag to GMA NewSteel™ abrasive, Apache increased productivity by 71%, saved 15% in project costs, lowered consumption by 50%—and eliminated the health hazards associated with slags. Armed with a safer, more productive abrasive and the proper blasting technique, Apache's team is getting the job done right—and moving on to the next in record time.

15%

Savings

Using GMA NewSteelTM

Blasting Trial

The most effective, objective way to compare the performance of any two blasting abrasives is by conducting a trial. That's exactly where we started with Apache. GMA's Technical Experts organized a full demo blasting trial for Apache's Site Manager and Maintenance Manager. The trial design mirrored the requirements of Apache's upcoming job: three blasters on an eight-ton pot with a required profile of 2mil to 4mil.
When GMA performed this side-by-side, real-time comparison of GMA NewSteel™ and Black Beauty Fine, the results were clear. While both technically delivered the required profile, GMA NewSteel™ produced a 2.8mil profile, while Black Beauty Fine nearly overshot the profile. 

Discover proven performance

Using GMA NewSteel™

Compared with Black Beauty Fine, GMA NewSteel™ cleaned nearly twice as many square feet per hour, with 50% less consumption. In all, GMA's garnet abrasive delivered 71% higher productivity at 15% less cost—and that's not even factoring in the extra cost to paint waste slag's excess profile.

Group 1215
productivity

71%

Per hour more efficient

Group 1215
Consumption

50%

less abrasive

Group 1215
Labor

62

hours

“In one day with GMA Garnet™, we completed the amount of work that would normally take a week with Black Beauty Slag."
Clay Donaldson
Site Foreman Apache Industrial Services

On-Site Situational Analysis

After earning Apache's trust with the comparison trial, GMA Technical Experts conducted an on-site situational analysis to identify both challenges and opportunities for optimization. Like many contractors, Apache struggled to manage multiple blasters around a large tank. Other challenges included coordinating the start and stop time of blasters, and preparing equipment on time. One by one, our Technical Experts helped Apache resolve these on-site risks. Our situational analysis also noted frequent equipment mismanagement. By ensuring the proper type and use of abrasive metering valves, resolving issues with coiled hoses and identifying compressors that weren't operating properly, we helped Apache reduce risk and avoid downtime.